Sign In | Join Free | My entremaqueros.com
China Zhengzhou Hengyang Industrial Co., Ltd logo
Zhengzhou Hengyang Industrial Co., Ltd
Commit to recycle waste sources, making earth better.
Verified Supplier

5 Years

Home > Mineral Processing Plant >

Iron Ore Pellet Production Line High Capacity 0.4-500t/h

Zhengzhou Hengyang Industrial Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Iron Ore Pellet Production Line High Capacity 0.4-500t/h

Brand Name : Hengyang

Model Number : HC-428

Certification : ISO9001

Place of Origin : China

MOQ : 1

Price : 5600-356100

Payment Terms : T/T

Supply Ability : 270 sets/month

Delivery Time : 20-40 days

Packaging Details : negociated

Name : Iron Ore Pellet Production Line

Application : Iron ore

Capacity : 0.4-500t/h

Color : customize

Condition : New

Contact Now

Iron ore occurs naturally in a variety of forms, from sand-like iron fines to solid rock masses. Crude ore, or ore mined in the natural state, seldom occurs in a pure state and requires some form of beneficiation.

Iron Ore Pellet Production Line High Capacity 0.4-500t/h

Iron ores often contain impurities, undesirable chemical components such as phosphorous, sulfur, sodium, potassium (alkalis), alumina, silica and sometimes titanium. Other components such as calcium and manganese, may be considered desirable, depending on the composition of other raw materials used in the individual iron or steel producer’s process.
There are a variety of beneficiation methods that can be used to prepare iron ores, depending on the iron content in the ores. Some ores contain greater than 60 percent iron and require only crushing and blending to prepare them for further beneficiation. In other cases, operations including screening and concentrating are necessary to prepare the raw materials. Generally, the operations required before the iron ore is considered a finished product include:

  • Crushing & Screening
  • Grinding
  • Concentration
  • Agglomeration

Iron ores, coke, and limestone that will be sent to blast furnaces for ironmaking need to be permeable to allow for an adequate flow of gas through the system. Additionally, concentrates in crude ores that are very fine need to be agglomerated before they can be used as feedstock for the blast furnaces. The three major processes used for agglomeration include:

Iron Ore Pellet Production Line High Capacity 0.4-500t/h

  • Sintering
  • Pelletizing
  • Briquetting

Product Tags:

Iron Ore Pellet Production Line

      

500t/h Pellet Production Line

      
 Iron Ore Pellet Production Line High Capacity 0.4-500t/h Manufactures

Iron Ore Pellet Production Line High Capacity 0.4-500t/h Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Zhengzhou Hengyang Industrial Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)